Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.
Episode Discussion
Login to leave a comment on this episode.
Mark has to offload 2,800 tonnes of timber before the weather turns, while Chris transports a 57-metre-long bridge section.
No comments yet. Be the first!