Try 30 days of free premium.

Sydney's Super Tunnel - Episode Guide

Season 1

Action Stations

Episode: 1x01 | Airdate: Aug 12, 2020

Action Stations

The show kicks off with a dynamic taster of what the series has in store - namely the inside story of a crack team building a trailblazing, fully-automated metro system costing $50 billion, by far the biggest and most advanced new railway opening anywhere on the planet in 2019. A dramatic scene with our main characters dealing with a crisis gets the ball rolling.

What Lies Beneath

Episode: 1x02 | Airdate: Aug 19, 2020

What Lies Beneath

We check in on our engineers encountering all manner of issues tunnelling through a minefield of existing infrastructure - skyscraper footings and basements, sewers, a graveyard, and existing rail tunnels.

Digging Deep

Episode: 1x03 | Airdate: Sep 2, 2020

No image (yet).

Another super challenge looms, perhaps the greatest of the entire project - digging two tunnels beneath Sydney Harbour.

In the early planning stages, the team actually considered dropping pre-fabricated tunnel sections down onto the floor of the harbour one by one, lowering them from barges, which was the way the road tunnel under the harbour was built.

Fast Tracked

Episode: 1x04 | Airdate: Sep 9, 2020

No image (yet).

We follow architect Ross de la Motte, seeing that his vision for the stations has finally come to light.

He has gone to great lengths to design stations that benefit from natural light and airflow, minimising the need for additional power.

Has he been successful?

Season 2

Great Expectations

Episode: 2x01 | Airdate: Apr 3, 2025

No image (yet).

An extension is now underway to get people into the centre of Australia's biggest city, including a new tunnel crossing deep under Sydney Harbour.

Down and Dirty

Episode: 2x02 | Airdate: Apr 10, 2025

No image (yet).

With the construction of Australia's biggest public transport project in full swing, we head back under Sydney Harbour and witness the historic completion of the twin metro rail tunnels deep below the surface.

Testing Times

Episode: 2x03 | Airdate: Apr 17, 2025

No image (yet).

With 30 kilometres of tunnelling finished, it's time to start building railway stations, laying tracks and testing driverless trains. At Australia's busiest railway station, Central Station, the pedestrian subway known as Central Walks comes to life.

Countdown to Launch

Episode: 2x04 | Airdate: Apr 24, 2025

No image (yet).

After almost 10 years of planning, building and testing, involving more than 60,000 people from around the world, Australia's largest transport infrastructure project nears completion.

Try 30 days of free premium.